Refacing cabinets is a smart way to update your kitchen without the mess or high cost of a full remodel. But what exactly happens during the process? If you’re considering this upgrade for your Austin home, here’s a step-by-step guide to help you know what to expect — from preparation to final cleanup.

Day 1: Consultation and Measurements

The process begins with an in-home consultation. A professional will inspect your existing cabinets, take measurements, and help you choose door styles, veneers, hardware, and finishes. This visit typically takes 1–2 hours.

Week 1–2: Material Ordering and Scheduling

After selections are made, your cabinet refacing company will order materials. This step usually takes 1 to 2 weeks, depending on availability and whether custom doors or finishes are required. Installation dates are scheduled during this time.

Day 2: Preparation and Setup

On the first day of the refacing installation, the crew will prepare your kitchen. This includes protecting floors and countertops, removing cabinet doors and drawers, and setting up equipment. Noise is minimal, but expect the use of power tools during working hours.

Day 3–4: Veneer and Hardware Installation

Refacing involves applying new veneer or laminate to the exterior cabinet boxes. New doors and drawer fronts are then installed, along with hardware. Depending on the size of your kitchen, this step typically takes 1–2 days.

Day 5: Final Adjustments and Cleanup

Installers make any necessary door and drawer adjustments to ensure smooth operation. The kitchen is then cleaned and inspected. Most companies haul away old hardware and packaging materials as part of the service.

Noise and Dust Levels

Cabinet refacing is much quieter and cleaner than demolition-based remodeling. There will be some sawing and light sanding, but no heavy demolition or construction waste. Most homeowners stay in their homes during the project with minimal disruption.

Total Timeline: 3 to 5 Days of Installation

Once materials are ready, the actual refacing process takes just a few days. From first consultation to final walkthrough, you can expect the full timeline to span about 2–3 weeks total.

Key Advantages of Refacing Cabinets

  • No need to remove appliances or disrupt plumbing
  • Less dust, less noise, and less mess
  • Faster results than full cabinet replacement
  • You can stay at home during the process

Interested in cabinet refacing? Schedule your free consultation and get a clear, customized timeline for your project in Austin.

Dec, 1, 2022

Need help with your kitchen?

Get a free consultation - just call us!

Latest News

Contact Us